Poly pipe installation manual


















Commercial Water Management Solutions. Cable Protection Systems. Sewer Systems. Surface Water Drainage Systems. Water Management Solutions. Select type Select all Brochures and Flyers. Case Studies. Installation Guides. Manufacturers Safety Datasheets. Polypipe Product Safety Information. Price Lists. Ground water should not be in the canal. If there is any, it should be discharged out of the canal with the means of a pump.

Pipes laid under the ground have exposed some burdens outside the soil load. These can be loads that occur directly in the laying of pipes to the sea, such as sea discharge, or there may be extra loads created by groundwater when the pipe is laid under the ground. Apart from these loads, pipes are intertwined by using the shirting method, lining concrete is made to fill the gap between pipes or in projects where there will be excessive stress, such as additional loads in vacuum-operated pipes for suction purposes, it is necessary to calculate stability collapse.

The surfaces of the pipes to be welded are transported to molten temperature and are left to cool under pressure. PE Pipe should be made by certified people who have received training.

Pipe surfaces to be welded, Butt Welding Machine should be shaved with the shaving unit. Shaved surfaces again should not be polluted. Check if it is fixed. It is a method that provides the joining of PE pipes by welding by means of fasteners, the inner surfaces of which are covered with special resistance wires. The machine will start the welding process automatically according to the information on the barcode and finish the process at the end of the period. Before the main test, this test must be done to see if there are any leaks.

One end of the line should be closed and must be filled with water. The line should be brought to the desired pressure in 10 minutes and the test pressure should be maintained by keeping the pump engaged for another 10 minutes. After the line is checked, The test should be repeated until there is no pressure loss. The pressurized pipeline continues to expand despite being exposed to pressure during the preliminary test.

Along with providing a brief introduction to the association, the webinar will focus on the benefits of using pre-compounded PE materials certified by the association and highlight some of the PE technical guidance.

Pilot Tube Microtunnelling. Impact Moling. Mole Ploughing. Pipe Rehabilitation Methods Die Drawing. Slip lining. Pipe Bursting and Splitting. Pipe Reaming. Pipe Extraction. Supporting Processes Pipe Assembly and Handling. Installation Manual.



0コメント

  • 1000 / 1000